Perth Academy
Perth, Scotland
Contractor: Kilmac
Main Contractor: Robertson Construction
This project showed the versatility of the system. It was mainly a single sided form with a short section of standard double side with a sloped finish. Using the rebar loop ties and wire mesh for the back of the pour it was very fast and easy to set the forms. Walls were 300 and 450mm wide, and varied from 1500 – 1800mm high. Main form ply was 18mm Recycled Plastic sheets 1220×2440 with plywood strips on top to reach to pour height.